INTEGRATED FEED PLANT | ERZURUM

Project Description:
The Integrated Feed Plant project in Erzurum stands as a key development in Turkey’s industrial sector, following the innovative approach established in the Kırklareli facility. Utilizing Building Information Modelling (BIM) technology, this project exemplifies the integration of advanced design and construction methodologies in industrial architecture. The use of BIM ensured that every phase, from design to construction and operation, was meticulously coordinated, resulting in a highly efficient and sustainable facility. This project further reinforces the commitment to adopting cutting-edge technology in industrial design, enhancing production capabilities while setting a benchmark for future developments.

  • Partners in Charge

    Doruk Salalı
    Salih Z. Salalı

  • Total Construction Area

    10.000 m²

  • Location

    Erzurum / Türkiye

  • In Collaboration with

    Structural Designer:
    2G Engineering
    Mechanical Engineering:
    GES Group
    Electrical Engineering:
    Güvem Proje

  • Service

    Schematic Design
    Design Development
    Construction Documentation
    Tender Documents